
description About
The subsea well constructed in Gela in 1959 by Eni was the first of its kind in Europe. The facility consisted of two interdependent complexes: a steel platform on the sea floor and a support ship. The very viscous oil gushed from the Sicilian land to flow to collection centers.
Info
- verified Status: Released
- calendar_month Release Date: 1960-01-01
- video_camera_front Companies Eni
- timer Runtime: 26 Mins
- star Rating: 0 / 10
- favorite Likes: 0 Likes
- info IMDB ID
- visibilityViews:
-
starUser Ratings:
image Images

groups Crew

Franco Dodi
Director

Antonio Busia
Director of Photography

Andrea Pittiruti
Underwater Camera

Vittorio De Seta
Director

T. Tresol
Original Music Composer

Vittorio De Seta
Screenplay
comment Comments