description About
The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
Info
- verified Status: Released
- calendar_month Release Date: 2018-10-01
- video_camera_front Companies Video 125
- timer Runtime: 112 Mins
- star Rating: 0 / 10
- favorite Likes: 0 Likes
- info IMDB ID
- visibilityViews:
-
starUser Ratings:
comment Comments