description About
Traffic on the B61 road, which connects Rotterdam to Warsaw and cuts through the German spa town of Bad Oeynhausen, is permanently gridlocked. The promised cure is a bypass whose construction is documented for a period of eight years: the efforts of the mayor, police, fire brigade and construction companies, the delays in the construction of the northern bypass and above all the reactions of the affected residents.
Info
- verified Status: Released
- calendar_month Release Date: 2020-02-27
- video_camera_front Companies Filmuniversität
- timer Runtime: 85 Mins
- star Rating: 0 / 10
- favorite Likes: 0 Likes
- info IMDB ID tt11210450
- visibilityViews:
-
starUser Ratings:
play_circle Streaming Sources
groups Crew
Momas Schütze
Editor
Henning Fuchs
Music
Daniel Abma
Script
Daniel Abma
Director
David Schittek
Cinematography
Johannes Wöpkemeier
Producer
Malte Eiben
Sound
Niklas Burghardt
Producer
comment Comments