![](https://image.tmdb.org/t/p/w500/gskbcaD2uro6iksiwk8akkO9fW3.jpg)
description About
Tim and Siddy reveal the incredible story of the Thames Tunnel – the first successful tunnel built under a major body of water anywhere in the world. It was built by Brunel and his father – and not originally intended for trains - but today links Rotherhithe and Wapping stations. Tim hears about the incredible engineering that made the tunnel possible – as well as the many failed attempts to get it right, including a major flood. Siddy walks the tracks in search of evidence of the tunnel’s original construction, revealing a series of striking arches. In Lambeth North, Siddy explores this classic Leslie Green station, one of the least used in zone 1. But it has a significant history as a shelter during the Second World War, and as a training base for London Transport workers, especially women drafted in to work on the tube during the war.
Info
- verified Status: Returning Series
- person By: Unknown
- calendar_month Release Date: 2024-07-30
- video_camera_front Companies Brown Bob Productions
- tag Season: Season 4
- timer Episode Runtime: 44 Mins
- star Rating: 0 / 10
- visibilityViews:
-
starUser Ratings:
comment Comments