description About
Progress on the kitchen and wall removal, fitting the new heating system, and loft insulation. With tips on joining pipework, fitting a garden tap, matching bricks, the first phase of rendering outside brickwork, and re-hanging a door.
Info
- verified Status: Ended
- person By: Unknown
- calendar_month Release Date: 2004-07-09
- video_camera_front Companies Zenith Entertainment
- tag Season: Season 1
- timer Episode Runtime: 50 Mins
- star Rating: 0 / 10
- visibilityViews:
-
starUser Ratings:
comment Comments