NHK Documentary Season 18 episode 8 (2016)

star 0


description About

At the accident site of the Fukushima Daiichi Nuclear Power Plant, the decommissioning of reactors involving the removal of nuclear fuel from 3 crippled reactors seems unending. Some estimates say it will take over 40 years until all the work is complete. Nuclear debris still continues to release fatal amounts of radiation, making close investigation impossible. Therefore, alternative inspection methods using cutting-edge technology are ongoing, including small remotely-operated robots and cosmic-ray, sub-atomic technology to image and detect debris inside the reactor. Can humans safely control nuclear power? Decommissioning Fukushima is a "front line" record of the accident that attempts to answer this question.

Info

  • verified Status: Returning Series
  • person By: Unknown
  • calendar_month Release Date: 2016-03-13
  • video_camera_front Companies NHK
  • tag Season: Season 18
  • timer Episode Runtime: 50 Mins
  • star Rating: 0 / 10
  • share Share:
  • visibilityViews:
    2 views
  • starUser Ratings:
    Login to rate

    0.0

    (0 Votes)

Other Episodes

All Episodes

35 Eps

movie Recommendations

comment Comments