description About
The Lake Forest project is well under way as Norm works in his temporary garage workshop making the bracketed posts to be used on the breakfast room's exterior. Steve meets up with project manager Jim Eimerman for an update: a dip in the floor has been addressed with a steel beam in the basement and the floor resheathed with plywood; new windows have arrived; a new concrete floor has been poured in the breakfast room; and the drywall is up. In a flashback, Norm sees polyurethane foam insulation blown into the walls. Steve and Heidi visit kitchen designer Eileen Thurnauer at a showroom in Hinsdale, Illinois, not far from the airport. Back on East Atteridge, Heidi puts some countertop materials through a stress test and Norm, Jim, and Steve work to install the posts and beam on the front section of the breakfast room.
Info
- verified Status: Returning Series
- person By: Russell Morash
- calendar_month Release Date: 2003-02-27
- video_camera_front Companies This Old House Productions
- tag Season: Season 24
- timer Episode Runtime: Mins
- star Rating: 0 / 10
- visibilityViews:
-
starUser Ratings:
comment Comments