description About
At the house, out front we get to know the contractor while Ipe is being installed on the porch ceiling. Out back, a brick patio is laid. Inside, a dual fuel HVAC system is installed and ducts ran. At the Dracut Centre School, corbels are restored.
Info
- verified Status: Returning Series
- person By: Russell Morash
- calendar_month Release Date: 2022-02-24
- video_camera_front Companies This Old House Productions
- tag Season: Season 43
- timer Episode Runtime: Mins
- star Rating: 0 / 10
- visibilityViews:
-
starUser Ratings:
comment Comments