description About
The concrete basement floor is poured, leveled, and screeded; our contractor Ron repairs a broken window pane the old-fashioned way, and Bob discusses the electrical layout for the first floor with electrician Slav Witowski.
Info
- verified Status: Ended
- person By: Unknown
- calendar_month Release Date: 1991-01-07
- video_camera_front Companies
- tag Season: Season 1
- timer Episode Runtime: Mins
- star Rating: 0 / 10
- visibilityViews:
-
starUser Ratings:
comment Comments