description About
Bryan's done with the downstairs and now he can start work on the final part of the house the master bedroom and ensuite. Once a huge fireplace is installed, Bryan and Adam get work tiling the bedroom wall. While Sarah and Rebecca try and sneak a paint colour past Bryan.
Info
- verified Status: Ended
- person By: Unknown
- calendar_month Release Date: 2010-03-11
- video_camera_front Companies Si Entertainment
- tag Season: Season 1
- timer Episode Runtime: 30 Mins
- star Rating: 0 / 10
- visibilityViews:
-
starUser Ratings:
comment Comments