Modern Marvels Season 7 episode 3 (2000)

star 0


description About

The challenge of linking Britain and France with a tunnel under the English Channel was both monumental and delicate. It took 18 months just to design and build the 28 foot diameter TBMs, and nearly a year to assemble and position them underground. Modern Marvels takes you through the entire process from start to finish.

Info

  • verified Status: Returning Series
  • person By: Bruce Nash
  • calendar_month Release Date: 2000-01-11
  • video_camera_front Companies Jupiter Entertainment, Six West Media
  • tag Season: Season 7
  • timer Episode Runtime: 44 Mins
  • star Rating: 0 / 10
  • share Share:
  • visibilityViews:
    3 views
  • starUser Ratings:
    Login to rate

    0.0

    (0 Votes)

comment Comments