Extreme Engineering Season 9 episode 4 (2011)

star 0


description About

The London Aquatics Centre will host 44 swimming & diving events during the 2012 Olympics and live on as a new addition to the London landscape. Danny Forster goes with crews as they construct one of the most advanced swimming facilities ever built.

Info

  • verified Status: Ended
  • person By: Unknown
  • calendar_month Release Date: 2011-04-29
  • video_camera_front Companies Powderhouse Productions
  • tag Season: Season 9
  • timer Episode Runtime: Mins
  • star Rating: 0 / 10
  • share Share:
  • visibilityViews:
    3 views
  • starUser Ratings:
    Login to rate

    0.0

    (0 Votes)

comment Comments