description About
If Nicole is going to turn the entire third floor of her Grand Blvd. estate into a master suite, a custom new bathroom will have to be the first step. She starts with an overcrowded, neglected bath that doesn't fit her grandiose plans. By knocking down a wall and changing some angles, the floorplan is expanded to include a double vanity, claw-foot tub and walk-in shower. Despite a small plumbing mishap, Nicole's new bathroom is shaping up to be one of the most original and inviting spaces in her 1913 auction home.
Info
- verified Status: Ended
- person By: Unknown
- calendar_month Release Date: 2015-04-16
- video_camera_front Companies Magnetic Productions, Departure Films
- tag Season: Season 6
- timer Episode Runtime: 23 Mins
- star Rating: 0 / 10
- visibilityViews:
-
starUser Ratings:
comment Comments