description About
The Bay Bridge joining Oakland and San Francisco made headlines in 2009 when it was shut down for a major renovation. To make the fix, Riley joins the engineering team tasked with cutting a football field-sized section of roadway from the bridge and replacing it - in just 72 hours! With traffic halted and the world watching, the team encounters some unexpected challenges. A crack puts the operation on hold and requires custom-made colossal steel brackets. The clock is ticking.
Info
- verified Status: Ended
- person By: Unknown
- calendar_month Release Date: 2010-06-17
- video_camera_front Companies
- tag Season: Season 3
- timer Episode Runtime: 60 Mins
- star Rating: 0 / 10
- visibilityViews:
-
starUser Ratings:
comment Comments